Customization: | Available |
---|---|
Customized: | Customized |
Standard Component: | Standard Component |
Still deciding? Get samples of US$ 20/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Stop Check Valve for Industrial Refrigeration
Applicable Medium: Ammonia, Fluorine, Propane, Propylene, CO2, etc.
Feature: The stop check valve is a multi-purpose valve with the functions of stop valve and check valve. Its structure is similar to that of stop valve, but the stem and disc are not fixedly connected. When the valve stem is lowered and the disc is tightly pressed on the valve seat, it acts as a stop valve; when the valve stem rises, it acts as a check valve. On pipelines that need to install stop valves and check valves at the same time (such as the outlet of water pumps), or in places where the installation location is limited (such as ships), using stop and check valves can save installation costs and space.
VCY15-80D Straight Through Stop Check Valve
Nominal pressure: 4.0Mpa
Applicable temperature: -50ºC~+150ºC
Test pressure: 6.0Mpa
Applicable medium: Ammonia, Fluorine, propane, propylene, etc
Name | Type | Size(mm) | Weight (kg) |
|||||
Straight Through Stop Check Valve |
φD | φD1 | L | φD0 | H1 | H | ||
VCY15-D | 21 | 15 | 106 | 65 | 150 | 165 | 1.5 | |
VCY20-D | 25 | 20 | 106 | 65 | 155 | 170 | 1.6 | |
VCY25-D | 32 | 25 | 128 | 75 | 190 | 207 | 2.4 | |
VCY32-D | 38 | 32 | 128 | 75 | 193 | 210 | 2.8 | |
VCY40-D | 45 | 40 | 165 | 95 | 237 | 264 | 4.8 | |
VCY50-D | 57 | 50 | 165 | 95 | 243 | 270 | 5.0 | |
VCY65-D | 76 | 65 | 195 | 105 | 307 | 340 | 8.7 | |
VCY80-D | 89 | 80 | 212 | 115 | 326 | 365 | 10.0 |
The Industrial refrigeration valves in AMG series are featured by good-looking and artistic appearance, advanced and unique structure, light and flexible operation, excellent sealing performance, zero leakage, high reliability and long service life. They are widely used in refrigerated-storage and freezing systems in the industries of cooling, refrigeration and air-conditioning as well as the industries of food, beverage, bear, pharmaceutical, ship-building, gas, chemical, petroleum, etc.
Q: What's the lead time for valves?
A: Usually 15 days after the deposit, depending on order quantity
Q: What's the payment term?
A: Usually T/T with 30% as deposit and 70% before delivery.
Q: What kind of shipping methods available?
A: Sea, Air, Railway transportaion are all available.