Customization: | Available |
---|---|
Condensation Forms: | Water-Cooled |
Refrigerant: | R717/R404A/R507/CO2 |
Still deciding? Get samples of US$ 1000/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Top Quality Galvanized Coils For ATC Evapco Water Fluid Cooler And Evaporative Condenser
Why Choose CHT TECK Coils For Evaporative Condensers and Cooling Tower?
* Drawing confirmation, make sure 100% Replcable To The Original One.
* 100% heat rejection capacity guarantteed
* Top quality raw materials, make sure its long service life.
* Various kind tube available, suitable to different brand different models
* Skillful technical team and welding workers, ensure its high quality
Model | Capacity | Fan Qty | Fan Power | Spray Pump Qty | Spray Pump Power | Dimension |
CEHX-1000 | 1000KW | 1 Pcs | 7.5KW | 1 Pcs | 3KW | 3260*2200*3790mm |
CEHX-2000 | 2000KW | 2 Pcs | 7.5KW | 1 Pcs | 3KW | 5040*2200*4070mm |
CHT TECK brand Evaporative Condenser designed with modular parts, suitbale for container loading.
CHT TECK CO., LTD is a reliable equipment supplier for customers worldwide in industrial refrigeration and cooling field. Her factory of evaporative condenser and cooling tower equipment located in Shandong Province,China, with area 38000m³, is the production base of 'CHT TECK' brand evaporative condenser, cooling tower, closed circuit cooling tower, air cooler etc.
Why choose CHT TECK company?
*Skillful production worker team make sure equipment good quality.
*Have a sound quality control system.
*Good sense of service. Focusing on meeting customer needs.
*Products hot sell over 60 countries worldwide.
*Cooperative with many international famous brands, such as Coca-Cola, Nestlé, Ingersoll Rand, GEA, Mycom, etc.
Q: What's the lead time?
A: Usually 30 to 40 days after the deposit, depending on order quantity
Q: What's the payment term?
A: Usually T/T and LC.
Q: What kind of shipping methods available?
A: Sea, Railway transportaion are available. Suitable for container loading.